Main projects implemented in 2016-2019, OJSC "BELTRUBOPROVODSTROY"

Pipelines


 
Object Customer Years of construction
Overhaul of the main gas pipeline "Torzhok-Minsk-Ivatsevichi" (1st stage)
Total length - 15,66 km
Diameter - 1220 mm
OJSC Gazprom Transgaz Belarus 2019
Construction of a high pressure gas pipeline from the connection point in the area of ​​ag. Kolno, Zhitkovichi district for gasification of consumers in Turov
Total length - 21.00 km,
Diameters - 219 mm
RUE Gomeloblgaz 2019
Construction of a mining and processing complex with a capacity of 1.1 to 2.0 million tons of potassium chloride per year at the raw material base of Nezhinsky (eastern part) of the Starobinsky potassium salt deposit ”
Total length - 40.00 km
Diameter - 426 mm
LLC Slavkali 2019
Construction of the Acron gas lateral pipeline and gas distribution system
Total length - 17.00 km,
Diameters - 720 mm
LLC Slavkali 2019
Reconstruction of the Unecha-Mazyr trunk oil pipeline
Total length - 22.56 km,
Diameters - 1020 mm
Gomel-trans Neft Druzhba OJSC 2017

Microtunnelling


 
Object Customer Years of construction
Residential complex in the area of ​​der. Kolodishchi, Minsk region. " Relocation of the Vostochny collector by microtunnelling with an increase in diameter from Partizansky Ave. to KNS-19 (Mashinostroiteley Str.)
Total length - 1.99 km,
Diameters - 2000 mm
Municipal Unitary Enterprise “Department of Road and Bridge Construction and Improvement of the Minsk City Executive Committee” 2019
Project for development of microdistrict No. 21,22,23 in Zhlobin. Off-site networks. Laying the manifold using microtunnelling (Mashinostroiteley St.)
Total length - 0.99 km
Diameter - 2000 mm
Gomelpromstroy OJSC 2016

Direct Pipe


 
Object Customer Years of construction
Construction of the main pipeline across the Danube River using the Direct Pipe method
Total length - 1,40 km,
Diameters - 1220 mm
Infrastructure Development and Construction Company d.o.o. Beograd - Nowy Beograd ”(Serbia) 2019

Horizontal directional drilling


 
Object Customer Years of construction
Construction of a trunk pipeline in Serbia to the border with Hungary across the Karash, Tisa, Nadel, Tamish, Velika, Danube rivers
Total length - 5.37 km,
including the largest crossing - 1.34 km
Diameters - 1220 mm
Infrastructure Development and Construction Company d.o.o. Beograd - Nowy Beograd ”(Serbia) 2019
Construction of a mining and processing complex with a capacity of 1.1 to 2.0 million tons of potassium chloride per year at the raw material base of Nezhinsky (eastern part) of the Starobinsky potassium salt deposit ”
26 Conversions
Total length of crossings is 3, 47 km
Diameters - 630 mm, 710 mm
LLC Slavkali 2019
Reconstruction of the underwater crossing of the Mozyr-Brest trunk pipeline DN 600 (main thread) and DN 800 (main thread) through the Pripyat and Pina rivers with pipe replacement, km 216-226
4 transitions
Total crossing length - 1, 48 km
Diameters - 630 mm, 820 mm
Gomeltransneft Druzhba OJSC 2019
Construction at the Minsk national airport. Removal of the high pressure gas pipeline
4 transitions
The total length of the crossings is 0.37 km
Diameters - 530 mm
RUE "National Airport Minsk" 2017