Construction of a trunk pipeline in Serbia to the border with Hungary across the Karash, Tisa, Nadel, Tamish, Velika, Danube rivers
Total length - 5.37 km,
including the largest crossing - 1.34 km
Diameters - 1220 mm
|
|
2019
|
Construction of a mining and processing complex with a capacity of 1.1 to 2.0 million tons of potassium chloride per year at the raw material base of Nezhinsky (eastern part) of the Starobinsky potassium salt deposit ”
26 Conversions
Total length of crossings is 3, 47 km
Diameters - 630 mm, 710 mm
|
|
2019
|
Reconstruction of the underwater crossing of the Mozyr-Brest trunk pipeline DN 600 (main thread) and DN 800 (main thread) through the Pripyat and Pina rivers with pipe replacement, km 216-226
4 transitions
Total crossing length - 1, 48 km
Diameters - 630 mm, 820 mm
|
|
2019
|
Construction at the Minsk national airport. Removal of the high pressure gas pipeline
4 transitions
The total length of the crossings is 0.37 km
Diameters - 530 mm
|
|
2017
|