Object Customer Years
Construction of "Gomel-Gorki" main oil pipeline with the total length of 17.587 km including the implementation of four underwater crossing over the Dobrich, Kosolyanka, Krupka, Pronya Rivers using directional drilling technology and 23 crossing under the automobile roads with using auger drilling. Diameter of the pipe is 530 mm ОАО "Гомель-транс нефть Дружба 2021
Overhaul of the Torzhok-Minsk-Ivatsevichi main gas pipeline (1st stage). Total length - 12.813 km; Diameter– 1220 mm projects implemented 2021
Complex of construction and installation works for the facilities "Expansion of gas gathering station. Construction of gas plumes of Pribug UGS" and "Reconstruction of inhibitor supply system of Pribug UGS" projects implemented 2020
Reconstruction of the main gas pipeline «Torzhok-Minsk-lvacevichi» first stage. Total length - 17.44 km; Diameter - 1220 mm projects implemented 2020
Reconstruction of the main gas pipeline "Torzhok-Minsk-Ivatsevichi" (1st stage) Total length - 15.66 km Diameter - 1220 mm projects implemented 2019
Construction of a high pressure gas pipeline from the connection point in the area of ​​ag. Kolno, Zhitkovichi district for gasification of consumers in Turov Total length - 21.00 km, Diameters - 219 mm Logo 2019
Construction of a mining and processing complex with a capacity of 1.1 to 2.0 million tons of potassium chloride per year at the raw material base of Nezhinsky (eastern part) of the Starobinsky potassium salt deposit ” Total length - 40.00 km Diameter - 426 mm projects implemented 2019
Сonstruction of gas pipeline-branch to gas-distribution station "Akron". Total length - 17.00 km, Diameters - 720 mm logo-Acron2 2018
Reconstruction of the Unecha-Mazyr trunk oil pipeline Total length - 22.56 km, Diameters - 1020 mm ОАО "Гомель-транс нефть Дружба 2017

Microtunnelling projects implemented

Object Customer Years
Residential complex in the area of ​​der. Kolodishchi, Minsk region. " Relocation of the Vostochny collector by microtunnelling with an increase in diameter from Partizansky Ave. to KNS-19 (Mashinostroiteley Str.) Total length - 1.99 km, Diameters - 2000 mm КУП «Управление дорожно-мостового строительства и благоустройства Мингорисполкома» 2019
Project for development of microdistrict No. 21,22,23 in Zhlobin. Off-site networks. Laying the manifold using microtunnelling (Mashinostroiteley St.) Total length - 0.99 km Diameter - 2000 mm ОАО «Гомельпромстрой» 2016

Direct Pipe projects implemented

Object Customer Years
Construction of the main pipeline across the Danube River using the Direct Pipe method Total length - 1,40 km, Diameters - 1220 mm projects implemented 2019

Directional drilling projects implemented

Object Customer Years
Construction of "Gomel-Gorki" main oil pipeline including the implementation of four underwater crossing over the Rivers Dobrich (crossing length is 443 m), Kosolyanka (crossing length is 371 m), Krupka (crossing length is 459 m) and Pronya (crossing length is 487 m) by directional drilling method. Diameter of the pipe is 530 mm ОАО "Гомель-транс нефть Дружба 2021
The construction (reconstruction) of the main gas pipeline crossing under the Tab-Yaha River (Western Siberia) with the diameter of 1420 mm and total length of 781 m. The length of the reconstructed section is 1340 m gazprom-logo 2021
Construction of a trunk pipeline in Serbia to the border with Hungary across the Karash, Tisa, Nadel, Tamish, Velika, Danube rivers Total length - 5.37 km, including the largest crossing - 1.34 km Diameters - 1220 mm projects implemented 2019
Construction of a mining and processing complex with a capacity of 1.1 to 2.0 million tons of potassium chloride per year at the raw material base of Nezhinsky (eastern part) of the Starobinsky potassium salt deposit ” 26 Conversions Total length of crossings is 3, 47 km Diameters - 630 mm, 710 mm projects implemented 2019
Reconstruction of the underwater crossing of the Mozyr-Brest trunk pipeline DN 600 (main thread) and DN 800 (main thread) through the Pripyat and Pina rivers with pipe replacement, km 216-226 4 transitions Total crossing length - 1, 48 km Diameters - 630 mm, 820 mm ОАО "Гомель-транс нефть Дружба 2019
Construction at the Minsk national airport. Removal of the high pressure gas pipeline 4 transitions The total length of the crossings is 0.37 km Diameters - 530 mm РУП «Национальный аэропорт Минск» 2017
en_GBEnglish (UK)