Construction of "Gomel-Gorki" main oil pipeline including the implementation of four underwater crossing over the Rivers Dobrich (crossing length is 443 m), Kosolyanka (crossing length is 371 m), Krupka (crossing length is 459 m) and Pronya (crossing length is 487 m) by directional drilling method. Diameter of the pipe is 530 mm
|
|
2021
|
The construction (reconstruction) of the main gas pipeline crossing under the Tab-Yaha River (Western Siberia) with the diameter of 1420 mm and total length of 781 m. The length of the reconstructed section is 1340 m.
|
|
2021
|
Construction of a trunk pipeline in Serbia to the border with Hungary across the Karash, Tisa, Nadel, Tamish, Velika, Danube rivers
Total length - 5.37 km,
including the largest crossing - 1.34 km
Diameters - 1220 mm
|
|
2019
|
Construction of a mining and processing complex with a capacity of 1.1 to 2.0 million tons of potassium chloride per year at the raw material base of Nezhinsky (eastern part) of the Starobinsky potassium salt deposit ”
26 Conversions
Total length of crossings is 3, 47 km
Diameters - 630 mm, 710 mm
|
|
2019
|
Reconstruction of the underwater crossing of the Mozyr-Brest trunk pipeline DN 600 (main thread) and DN 800 (main thread) through the Pripyat and Pina rivers with pipe replacement, km 216-226
4 transitions
Total crossing length - 1, 48 km
Diameters - 630 mm, 820 mm
|
|
2019
|
Construction at the Minsk national airport. Removal of the high pressure gas pipeline
4 transitions
The total length of the crossings is 0.37 km
Diameters - 530 mm
|
|
2017
|