From the year of its establishment in 1969, BELTRUBOPROVODSTROY JSC becomes the main contractor for the construction of the Druzhba oil pipeline and the Unecha-Mozyr-Uzhgorod, Unecha-Polotsk-Ventspils, Rivne-Brest oil pipelines, pumping stations and tank farms.
28 oil pumping stations and their lines were built, including the large head stations of Mikhalki in Mozyr and the Polotsk pump station with tank farms.
A modern export customs terminal with a tank farm with a capacity of 110,000 m3 was built for Transnefteprodukt in Unecha, Bryansk Region.