Beltps

Timeline

1965

Creation of the enterprise “Trust No. 2”

The open joint-stock company BELTRUBOPROVODSTROYSTROY was established in 1965 under the name Trust No. 2 of the All-Union Association Soyuzgazpromstroy of the USSR Ministry of Gas Industry with a deployment in the city of Gomel.

1965

1965

Unecha-Polotsk-Ventspils oil product pipeline

The main objectives of the trust were participation in the development of Belarusian oil fields and the construction of the Druzhba pipeline in the Unecha-Polotsk-Ventspils and Unecha-Gomel-Gdansk directions. At the same time, work was underway on the construction of the Unecha-Polotsk-Ventspils oil product pipeline.

1965

1969

First compressor station

In 1969, the first Privodino compressor station of the Ukhta-Torzhok gas pipeline in the Arkhangelsk Region was built at the gas transmission system construction sites of BELTRUBOPROVODSTROY OJSC.

1969

1972

Relocation

In 1972, “Trust No. 2” was relocated to the city of Minsk.

1972

1976

Underground gas storage

In 1976, BELTRUBOPROVODSTROY OJSC commissioned the first underground gas storage in Belarus in Osipovichi. Then, BELTRUBOPROVODSTROY OJSC became the general contractor for the construction of the Inčukalns UGSF in Latvia with the commissioning of all its lines, the capacity of the latter amounted to 1,400 million m3 of gas.

1976

1969-1988

Compressor and gas distribution stations

On three stages of the gas pipeline “Torzhok-Minsk-Ivatsevichi” and “Ivatsevichi-Kovel-Western border” of OJSC “BELTRUBOPROVODSTROY” compressor stations “Orsha”, “Minsk”, “Nesvizh”, “Ivatsevichi”, “Kobrin”, “Kovel” were built ” other. On gas pipelines passing through Ukraine, the CS Yagotin, Kirovogradskaya, Zadneprovskaya, and Dar’evka were built. The Izborsk compressor stations of the Valdai-Pskov-Riga gas pipeline, the Pikalevo and Sheksna compressor stations of the Gryazovets-Leningrad gas pipeline were built in the Russian Federation. With the participation of BELTRUBOPROVODSTROY OJSC, the Krasnozbenskaya compressor station was built for the reconstruction of the Minsk-Vilnius-Kaliningrad gas pipeline and the Minskaya gas station of the Yamal-Europe gas pipeline.

1969-1988

1994

Tank park

In the late 90s, an export customs terminal with a tank farm of 110 thousand m3 was built for Transnefteprodukt in Unecha, Bryansk Region.

1994

1996

Yamal-Europe

BELTRUBOPROVODSTROY OJSC built a 140 km section of the Yamal-Europe transcontinental gas pipeline DN 1420 mm in Belarus, the Torzhok-Minsk-Ivatsevichi gas pipeline.

1996

2000

Rename

In 2000, the company was reorganized into the Open Joint-Stock Company BELTRUBOPROVODSTROY.

2000

2000

Pribugskoye UGS facility

In 2000, BELTRUBOPROVODSTROY OJSC built the Pribugskoye UGS facility in the Brest region. In recent years, the capacity of this underground gas storage system has been steadily increasing through the development of additional wells. This made it possible to increase its volume by a factor of 1.5 and production capacity by a factor of two.

2000

2006

Gas pipeline branch

In 2006 BELTRUBOPROVODSTROY OJSC was built, a gas pipeline branch of 22 km in length was put into operation at the Kaliningrad TPP-2 with a connection unit to the Minsk-Vilnius-Kaunas-Kaliningrad gas pipeline for INTER RAO UES of Russia.

2006

2007

Mozyr UGS

In 2007, the Pribugskoye UGS facility began construction of the first stage of the Mozyr underground gas storage facility and already in 2008 gas was supplied to the UGS facility.

2007

2009

The age of NNB

On the territory of the Republic of Belarus, the company was the first to use the directional drilling method when laying trunk pipelines and utility networks. At present, BELTRUBOPROVODSTROY OJSC has significant experience in pipeline crossings under rivers, lakes, swamps, forests, roads and railways in the Republic of Belarus, the Russian Federation, the Republic of Lithuania, and Serbia. The organization’s arsenal has drilling complexes with a pulling force of 27 to 500 tons, which allow trenchless laying of pipelines with diameters from 100 to 1400 mm and a length of up to 2500 m

2009

2019

European record

The special pride of BELTRUBOPROVODSTROY OJSC is the acquisition and development of Direct Pipe technology manufactured by the German company Herrenknecht. Direct Pipe technology allowed BELTRUBOPROVODSTROY STROY to set a European record for the length of the transition under a 1420 m long water barrier under the Danube River in Serbia and to take third place in the world classification.

2019

2020

Expansion of gas transmission infrastructure of “Bulgartransgaz”

Complex of works on construction of the 1219 mm diameter gas trunkline crossing the Lom River by the DIRECT PIPE trenchless pipeline laying method and the Yantra River by the directional drilling method within the framework of the project “Expansion of Gas Transmission Infrastructure of Bulgartransgaz Company running parallel to the Northern Trunk Pipeline to the Bulgarian-Serbian Border”, stage: “Linear Part” No. 180-100″. The length of the performed underwater crossings over the river Lom by the trenchless laying method of the pipelines DIRECT PIPE – 489 m.p. and the river Yantra by the directional drilling method – 549,4 m.p.

2020
en_GBEnglish (UK)